 The
entire front of the building. Only one
more set of windows to be installed. |
 The
brick is repaired in the center. |
 The
new second story windows left. |
 Snoopy
looks over the new railings. |
 All
the fixtures are now hooked up. |
 The
newest windows from the inside. |