Opera House Renovation Progress 6/27/02
Click on any photo for a larger view
P6270175.JPG
Work really got underway in the lobby with
the wall between the old city offices and
lobby coming out.
P6270176.JPG
The walls and ceiling are pretty much gone
from the old city offices. The Safe sits on it's
metal post, waiting for removal.
P6270177.JPG
The mirrors have been removed (and
carefully stored) from the lobby.
P6270179.JPG
The truck was again filled to the rim.
P6270180.JPG
The Stairway to the balcony is taking shape
with more of the trim work getting done.
P6270182.JPG
In the balcony, we finished the flooring all
the way out except for the very front row.
P6270183.JPG
What used to be a large stack of flooring is
down to six sheets.
P6270184.JPG
Here's the other side, also finished except for
the very front row.